This is the third blog on my Riviera build. Below are links to the first and second blogs. https://boatbuilders.glen-l.com/43852/glen-l-riviera-build-by-donald-collier-cookeville-tn-build-summary-part-2/ November 1 – November 30, 2019 – Started installing the gas tank. I ordered a Moeller 25 gallon inboard gas tank with the mounting clips. The clips secure the gas tank from moving but allow for […]
(Note: if you want to read this in sequential order, start from the bottom) I started building the Riviera in October of 2015. I have been writing a blog from the beginning documenting the progress. The blog was getting very long very slow for me to update. The first blog documents progress from October 1, 2015 to […]
This blog documents progress from 10-1-15 Thru 5-7-16. See the second blog that documents progress from 5-7-16 to date. The following Link will take you to the Riviera build part two. Riviera Part Two Progress 10-1-15 Thru 5-7-16 The featured image is not the Riviera, but is close. I will be increasing the Riviera length […]
I am building the Glen-L Riviera boat. http://boatbuilders.glen-l.com/41211/glen-l-riviera-build-donald-collier-cookeville-tn/. I am at the point of applying the final veneer. After looking at other boat build blogs, websites, and pictures, I was not sure how best to temporarily fasten the veneer while the epoxy dries. There is a lot of information logged by boat builders using various […]