Archives

Squirt Decking Structure

On August 6, 2012, in Glen-L Styles, by areame
0

The Squirt has been flipped and I have the bow sub-decking structure dry fitted and am in the process of epoxying it. The coamings have been epoxied and fastened into place as well. That was one part of the build I wasn’t expecting to be so challenging. I soaked the wood over night in water […]

Changing a Runabout to an Open Utility Cockpit

On October 27, 2010, in News From Gayle, by Gayle Brantuk
1

We frequently get questions about opening up the cockpit of a runabout design, such as the Zip, to make it one large open cockpit. This is also referred to as a “utility cockpit”. In most cases, this alteration is feasible and simple to do. Plans for runabouts may have a mid-deck with beams that extend completely […]