The Squirt has been flipped and I have the bow sub-decking structure dry fitted and am in the process of epoxying it. The coamings have been epoxied and fastened into place as well. That was one part of the build I wasn’t expecting to be so challenging. I soaked the wood over night in water […]
We frequently get questions about opening up the cockpit of a runabout design, such as the Zip, to make it one large open cockpit. This is also referred to as a “utility cockpit”. In most cases, this alteration is feasible and simple to do. Plans for runabouts may have a mid-deck with beams that extend completely […]