Archives

Squirt Decking Structure

On August 6, 2012, in Glen-L Styles, by areame
0

The Squirt has been flipped and I have the bow sub-decking structure dry fitted and am in the process of epoxying it. The coamings have been epoxied and fastened into place as well. That was one part of the build I wasn’t expecting to be so challenging. I soaked the wood over night in water […]