This is the third blog on my Riviera build. Below are links to the first and second blogs. https://boatbuilders.glen-l.com/43852/glen-l-riviera-build-by-donald-collier-cookeville-tn-build-summary-part-2/ November 1 – November 30, 2019 – Started installing the gas tank. I ordered a Moeller 25 gallon inboard gas tank with the mounting clips. The clips secure the gas tank from moving but allow for […]
(Note: if you want to read this in sequential order, start from the bottom) I started building the Riviera in October of 2015. I have been writing a blog from the beginning documenting the progress. The blog was getting very long very slow for me to update. The first blog documents progress from October 1, 2015 to […]
A builder called the other day asking about staining the Raptor Composite Fastenings. He wasn’t sure what type of stain is recommended. After talking to the helpful Raptor folks, they informed me that any stain should work, but the key is to remove the sheen from the fastening. The builder I was talking to was […]
Enjoy the replay of our live Webinar titled, “All About Raptor Composite Fastenings”. It’s quite an informative discussion. In this Webinar you’ll discover: How to determine the length of composite fastening needed Critical tool techniques to get the best result Determining whether to use nails, brads or staples Which type of boat construction is best […]
As my wife calls it whenever I venture out to the shop to start a new furniture project, I’m going to start “sawing wood” for a new Riviera! This is something I have wanted to do for a very long time. I will be an active participant on this site, and hope to learn answers […]