This is a picture of my garage before I got started. I drew the outline of each of the components of the frames on the 3/4 marine ply and cut them out. The frames, stem, transom and keel in place. Rear view with temporary braces to hold everything straight and level. Notch for chine […]
To read the previous posts in this series, click the links below: Part 1 Part 2 Part 3 Part 4 December 14, 2011 This week I have installed the carlings. The plans call for anchoring them to the bow piece, then bend back into the frame notches and into the transom. I found that doing […]
To read the previous posts in this series, click the links below: Part 1 Part 2 Part 3 December 2, 2011 I haven’t accomplished much lately as I am waiting for the mahogany for the coamings, sheers and carlings. It’s supposed to be here by Dec. 6th, but that is not cast in stone. I […]